HomeMy WebLinkAbout0118103-HVAC (furnace & a/c)
~
OSHKOSH
ON THE WATER
Job Address 449 W 8TH AVE
CITY OF OSHKOSH
HVAC PERMIT -APPLICATION AND RECORD
No
118103
Owner
KELLY J BURNETT
Create Date 0210612006
Plan
Contractor THOMPSON HEATING AND COOLING S
1 1 Oil
Fuel 1"'1 Gas
System n New 1
~ Forced Air U Radiant
I I Electric I I Hot Water
Chimney Type K) Chimney A C) Chimney B
Heat Loss K ) As Approved . Existing
BTU Rate U As Per Plan C ) Variable
Category 502 - Residential-Both
1"'1 Electric
1 I Solid
1 I Solar
~ Replace
U Steam
D Other
I I Suppl.
. DirectVent
~ AlC 1
1 I Con. Burner I
C ) Not Applicable
U Vent
C) Not Applicable
. Other
Value
Value 80000
UselNature FRI Repalce furnace and AlC, and ductwork -No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION
of Work OF THIS APPLIANCE. - NO Chimney Liner being installed -Where an appliance is permanently disconnected from an existing chimney or
ent (CN), the CN shall be resized as necessary to control flue gas condensation in the Interior of the CN and to provide the appliance or
ppliances served with the req. draft.
Fees: Valuation
$4,400.00
Plan Approval
$0.00
Permit Fee Paid
$71.00
Issued By:
Date 0210612006
0 Permit Voided I
Parcelld # 0905870100
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
901 OTTER
OSHKOSH
WI 54901-0
Telephone Number
920426-3095
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.