HomeMy WebLinkAbout0118097-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 100 N MAIN ST
CITY OF OSHKOSH
No
118097
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor JIM'S PLUMBING & HEATING INC
OWner AKO OSHKOSH/PARKVIEW OSHKOSH/OSHKC Create Date 02/0212006
Plan G2-177-0106-P
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
0
0
2
3
0
2
1
6
0
0
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
1
1
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Category 440 - Industrial-Interior
0
0
0
0
0
0
0
0
0
Wait St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0
1
0
1
1
0
0
1
1
Shamp Sink 0 Coffee Maker 1
FlrlWst Sink 0 Int Grease Trap 2
Catch Basin 0 Ex! Grease Trap --.2
Wash Ftn 0 RPZ Valve 0
Urinal 1 Eye Wash Statn 0
Standp Rec 0 Wtr Sewer Mtrs 0
Ice Maker 1 Deduct Meters 0
Gar Drain 0 Wtr Usage Mtrs 0
Soda Disp 1
Sterilizer
Dip Well
Drink Ftn
Remodel tenant space for "Cranky Pat's Restaurant"
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 0800570000
Use/Nature
of Work
Valuation
Issued By
$20,000.00
Plan Approval
$0.00
Permit Fees
$189.00 0 Permit Voided I
Date 02103/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address W6166 GREENVILLE DR
Agent/Owner
GREENVILLE
WI 54942 - 0000
Telephone Number 920-757-5258
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5049 (920) 236-5106 FAX
ON THE WATER
April 7, 2006
Jim's Plumbing and Heating Inc.
W6166 Greenville Dr.
Greenville, WI 54942
Ref: Plumbing Plan Approval:
Cranky Pats Restaurant (tenant space remodel asbuilds)
100 N Main St., Oshkosh, WI
Plan 10# File-G2-177-0106-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. Temperature and pressure relief valve discharge for the water heater shall be
provided an approved receptor. COMM 82.40
2. Pre-wash sink for dishwasher shall be provided a direct connection to the sanitary
drain and vent system per COMM 82.30 and by letter dated 4/6/06 shall be installed
with a disposal to by-pass the grease interceptor.
3. The 3" drain serving the two public bathrooms shall meet the requirements to be
installed and sized as building drain per COMM 82.30, if not the drain must be sized
to accommodate a load of 22 dfu per COMM 82.30 as horizontal drain piping.
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfully,
/JV/
Paul Wolf,
Plumbing Inspector