Loading...
HomeMy WebLinkAbout0118095-Electric (bedroom) e OSHKOSH ON THE WATER Job Address 1805 DELAWARE ST CITY OF OSHKOSH No 118095 ELECTRIC PERMIT. APPLICATION AND RECORD Owner SHANNON TIMAMEE VERBURGT Create Date 02/03/2006 HOMEOWNER Service 0 New 0 Change 0 Temp Volts Amps -----P. Contractor Category 612 - Residential-Single Family AdditionlR Plan 8N/A Type 0 Overhead 0 Underground Circuits 0 Fixtures -----P. Switches 0 Receptacles -----p. Appliances UselNature of FRI Wiring Associated with Interior remodel on 1st floor bedroom. (Check attic for prior open correction notice related to knob and Work ube wiring being insulated, and open splices) $200.00 Plan Approval $0.00 Permit Fee Paid $20.00 Issued B . Date 2/3/06 n Permit Voided I Parcelld # 1408140000 The undersigned, in applying for an Electric Permit to perform electrical work within a single family home, owned and occupied as the principle residence by the undersigned, hereby acknowledges per City Municipal Code Section 11-22, that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t ecure any nece s ry,approvals befor ctivity. Date -;... - n (-,1) Signature AJ.I ~ Agent/Owner Address WI 5490 - 0000 Telephone Number 426-3992 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.