HomeMy WebLinkAbout0118094-Building (bedroom)
e
OSHKOSH
ON THE WATER
Job Address 1805 DELAWARE ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118094
Owner SHANNON T/MAMEE VERBURGT
Create Date
02103/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst: VB
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
0
Use/Nature ~FRllnterior remodel on 1st floor bedroom - remove plaster and lath, install new insulation. and drywall. Replace window in existing
of Work þpening, and remove closet from bedroom. (Verify that closet walls are non-bearing)
HVAC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 02103/2006
FinaIlO.P. 00/00/0000
0 Permit Voided I
Parcelld # 1408140000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any ne ssa approve be re s 'ng such activity.
Date õf-eJotio
OSHKOSH
WI 54902 - 0000
Telephone Number
426-3992
Signatur8\
Address 1805 DELAWARE ST
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.