Loading...
HomeMy WebLinkAbout0118094-Building (bedroom) e OSHKOSH ON THE WATER Job Address 1805 DELAWARE ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118094 Owner SHANNON T/MAMEE VERBURGT Create Date 02103/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: VB Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies Garage ~Sq.Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature ~FRllnterior remodel on 1st floor bedroom - remove plaster and lath, install new insulation. and drywall. Replace window in existing of Work þpening, and remove closet from bedroom. (Verify that closet walls are non-bearing) HVAC Contractor Plumbing Contractor Electric Contractor $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 02103/2006 FinaIlO.P. 00/00/0000 0 Permit Voided I Parcelld # 1408140000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any ne ssa approve be re s 'ng such activity. Date õf-eJotio OSHKOSH WI 54902 - 0000 Telephone Number 426-3992 Signatur8\ Address 1805 DELAWARE ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.