Loading...
HomeMy WebLinkAbout2006-Plumbing (water heater) 0 OSHKOSH ONTHEWATER-- Job Address 2165 WALNUT ST CITY OF OSHKOSH PLUNlBINGPERI'iIIIT~APPLICATION AND RECORD ---,,-----~- ----- --------- -------- ---- No 118077 ---~-------,----- Create Date 02102/200-6 Plán Owner SHARON SAWICKI Cãtegory 411 -R~s¡delÌt;al-Wá~~r Hëàfer~ Bathtub- Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures UselNature of Work . 0 0 0 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher -Sump Pump Classrm Sink Breakrm Sin~- EjëétorlGrind :~air~i._- Ice Chest Exam Sink ---- ~_:- :ohamp'Sink ~ 0 Flr~st_Sin_,,~ 0 Catch Basin 0 0 WashFtn ~ 0 Urinal ~ 0 Standp Rec ~ 0 Ice Maker 0 0 GarDrain 0 0 Soda Disp 0 Coffee Maker ~ lent <3re~_s~ _Trap 0 Ext Grease Trap 0 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Wa!!rSJJi'tèr_.~ . Local Waste 0 Clothes Wshr 0 Bidet 0 Beer Tap 0 Lab Sink 0 Sterilizer 0 Dip Well 0 Drink Ftn 0 0 0 0 0 0 0 0 ~ 0 Sculry Sink Hand Sink Plaster Sink Súrgeons Sink F Prep Sink Serv Sink r,,~~w'm~ -"DEBlTÆCCT Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Parcelld # 1218160000 Valuation Issued By Storm Sewer Water Service In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions Of which itis nota party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 522 W. MURDOCK AVE OSHKOSH '!'!'!.... 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the l"spìÚ:iion Requesrríñ,ïâi'23"¡¡:SUir¡'õ!"ong ilie Address, Permit Number, type of Inspeétion (í.e." Footing, Service, Final, etc.), Access into Buílding if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the ìnspection is not performed within tWo business days from the time the project is ready.