HomeMy WebLinkAbout0118071-Plumbing (water heater)
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
118071
,., ~"-"'-""~'""""Qv!m~r.. MICHAEUCHRISTY PATTON
Contractor
,c::r"~1!I!'"Q~..02(02i2006 ,---_.., "
Plan
Bathtub a Shower a WaterSoftner a a Shamp Sink ~ Coffee Maker a
Whirlpool or; F'loo{ Drain a Local Waste a ~, Elr~~!~"k_~, ,I~t ,<!~~!!,,~,Trap a
L.avatory a Lndry Tray a Clothes Wshr a a Catch Basin ~ Ext Grease Trap a
Toilet a Dispósál a "Bidet a Sculry Sink a Wash Ftn ~ RPZ Valve a
Rés. Sink a " DishYlas"~\>,r- ,.~ B~~r.:rap a Hand Sink a Urinal ~ Eye Wash Statn a
Bar Sink a Sump Pump a Lab Sink a Plaster Sink a Standp Rec ~ Wtr Sewer Mtrs a
Water Heater 1 Classrm Sink a Sterilizer ---.2 Surgeons Sink a Ice Maker a Deduct Meters a
Site Drain a Breakrm Sink a Dip Well a F Prep Sink a Gar Drain ~ Wtr Usage Mtrs a
Roof Drain a Ejector/Grind a Drink Ftn a Serv Sink a 'Sodá,Disp ~
Misc. a
Fixtures
Use/Nature REPLACE' GAS WATER HEðII;IL','ql;êlI.AÇ.ÇL. _.~"',- -, -,..'" ....."-..".-..-...-
of Work
Material
Typé
Conn:rype"
Size
#
a
a
a
a
a
a
0
a
a
a
Sanitary Sewer
Storm Sewer
Water Service
a
a
0
a
a
Parcelld #
1340410000
Valuation
$600.00' Plan Approval
Date 02102/2006
Issued By
""'-',,-,-
In the peliormance of this work, I agree to peliorm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which itis not a party, if you peliorm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address 522 W. MURDOCK AVE .. OSHKOSH ~ 54901 - 2298 Telephone Number 231-9880
To schedule inspectionsplea"ecålÎ thelnspec:Îion Reqûii"f ¡¡nil aI23t3:512lfnôfíng'tlí'êA'aCl,es,,;l'ermif'Ñ'ùñìber, Type of
Inspection (i.e: Footing, Service, Final, etc.), Access into Building if Securè (how do we gain entry), your Name and Phone
Number. Unless specified otherwis.e, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is nolperformed within two business days from the time the project is ready.