Loading...
HomeMy WebLinkAbout0118084-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1380CEAPEAVE Contractor SAMMONS PLUMBING No PLUMBING PERMIT - APPLICATION AND RECORD ~, ,~" -~-~~ ~~ ~ ~',,' -"~'" ~~','~ 02/02/2006 Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Dràin Roof Drain Misc. Fixtures 0 0 0 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray 'Disposal ~ Dishv.:asher, Sump Pump Classrm Sink Breakím Sink Ejector/Grind 0 Water S9ft,!er 0 0 shampsirik----9. 0 Local Waste 0 0 ~I.r~~t~i!!~.~ Clothes Wshr 0 0 Catch Basin ----9. Bidet 0 sculry Sink 0 Wash Ftn ----9. 0 BeerTap 0 Hand Sink 0 Urinal ----9. 0 Lab Sink 0 Plaster Sink 0 standp Rec ----9. 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 0 Dip Well 0 F Prep Sink 0 Gar Drain ----9. 0 Drink Ftn 0 serv Sink 0 Soda Disp ----9. Coffee Maker Int Gr~...~~.!rap ExtGrea~eTrap RPZ Valve Eye Wash statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs EPLACE GASWATER HEATER "DEBIT ACCT Sanitary Sewer Size Material , If "'Còññ:TY¡;e' 0 0 0 0 0 0 0 0 0 0 Valuation Storm Sewer ~ ""'Tÿpe'" 0 0 0 0 0 Water Service Parcelld # 0803060000 Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date 118084 0 0 0 0 0 0 0 0 AgenUOwner Address 522W.MURDOCKAVE OSHKOSH ~~,2298 T~lephoneNumber 231.9880 To schedule inspections please call the Inspection ReqÚest line at 2.36.:5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.),'Accessinto Building if'Secure (how do we gain entry), your Name and Phone Number. Unless specifiedotheiYIise, wewillassÚme the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.