Loading...
HomeMy WebLinkAbout0118070-Plumbing (water heater) ~ OSHKOSH ON THE WATER- Job Address 885WJ7THAV~E CITY OF OSHKOSH PLUMBING PERIVIIT~ÄPPLICATION AND RECORD No 118070 Contractor ,,~- LEE AlMICHELLE MOIN" " ~Creàte Date 02/02/2006 Plan Bathtub Whirlpoo¡" Lavatory Toilet Res. sínK"~ Barsí"k Water Heater Site Drain Roof Drain Misc. " Fixtures Use/Nature of Work 0 ~ V!'3!tèr!!,?!!n~r 0 Wai!.s!. 0 Shamp Sink 0 Coffee Maker 0 0" 0 Local Waste 0 Ice Chest 0 ,,~Ir~st "si,,~k---.J! l~t~~~...~Irap 0 0" Lnd.,. Tray" 0 Clothes Wshr 0 Exam Sink ~" Cat.ch Basin ~ "'!.t.~re.'!s_~ :rrap 0 0 Disposal 0 Bidet 0 sculry Sink 0 wash Ftn 0 ßf;¡:J!~I'!!t.-..."." 0 "cr Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash statn 0 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 "Stà"dp Ree 0 Wtr Sewer Mtrs 0 1 C]assrm si,,~k~ ,,~ Sterilizer ,,~ surgeons Sink 0 Ice Maker 0 Deduct Meters 0 0 Breakrm""sink" "~,, DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtr's 0 0 Ejector/Grind Drink Ftn 0 serv Sink 0 Soda Disp 0 O' r"~' ~ .",'" H~ -OmIT """ Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 0 0 0 0 0 0 0 0 0 0 Parcelld # 1410020800 Daté 02/0212006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction" While the City of Oshkosh has no authority to enforce easement ¡estrictionsQt:-yhlc'Lt\.iê.r.9!. a party, If you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity" Signature Date AgenUOWner Address 522 W" MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please ca¡"lthe l"spéi:tionReqÌJèÅ¡flfiieaf236-:5178 ñõting the Äaãress; Pëññiiíiffi'ñiDer;'TY'Pêõf"" Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (ho:.v do we gain entry), your Name and Phone Number. Unl.essspecified otherwise, we will assume the project is ready at the time the request is received. Work may continue if thejnspeCtion is not performed within two busin!,ss days from the time the project is ready.