HomeMy WebLinkAbout0118050-Building (kitchen)
0
OSHKOSH
ON THE WATER
Job Address 1107WBENTAVE
CITY OF OSHKOSH
No
118050
BUILDING PERMIT - APPLICATION AND RECORD
Owner PATRICK A WILSON
Create Date
02/01/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Garage
~Sq.Ft.
Baths
0
Size
0 Projection I
Canopies 0
Signs 0
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
Finished/Living
Bedrooms
0
Stories
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units -----2
# Structures
-----2
Use/Nature SFRI Covering the existing plaster with drywall and replacing the kitchen countertop(s). No structural work.
ofWorik
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$6,000.00 Plan Approval
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Issued By:
~
Date 02101/2006
Final/O.P. 00/00/0000
0 PennitVoided I
Parcelld # 1205500000
In the perfonnance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a partY, if you perfonn the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
'?
"'-'
-
Date '< '2. 1,1 D t.
Signature ~
Address 223 W 16TH AVE
Agent/OWner
OSHKOSH
WI 54902 - 6905
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.