HomeMy WebLinkAbout0118049-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 405 HIGH AVE
Contractor CITY OF OSHKOSH
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
118049
OWner CITY OF OSHKOSH REDEVELOPMENT AUTH( Create Date 01/31/2006
Category 401 - Residential-Exterior (laterals)
Plan
Bathtub 0 Shower 0 Water Sollner 0 Wait St. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Int Grease Trap ~
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Res. Sink 0 Dishwasher 0 BeerTap ~ Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer ~ Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink ~ Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
roo-~-"-
Size
Material
Type
#
0
0
0
0
0
0
0
0
0
0
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Issued By
Plan Approval
$0.00
Permit Fees
0
0
0
0
0
$0.00 0 Permit Voided I
Parcelld #
0102840000
Valuation
Date 01/31/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 1130
Agent/Owner
OSHKOSH
WI 54903 -1130
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.