Loading...
HomeMy WebLinkAbout0118049-Plumbing e OSHKOSH ON THE WATER Job Address 405 HIGH AVE Contractor CITY OF OSHKOSH CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 118049 OWner CITY OF OSHKOSH REDEVELOPMENT AUTH( Create Date 01/31/2006 Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower 0 Water Sollner 0 Wait St. 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Int Grease Trap ~ Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0 Res. Sink 0 Dishwasher 0 BeerTap ~ Hand Sink 0 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink 0 Sterilizer ~ Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink ~ Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature of Work roo-~-"- Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service Issued By Plan Approval $0.00 Permit Fees 0 0 0 0 0 $0.00 0 Permit Voided I Parcelld # 0102840000 Valuation Date 01/31/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 1130 Agent/Owner OSHKOSH WI 54903 -1130 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.