HomeMy WebLinkAbout0118027-Building (alterations)
e
OSHKOSH
ON THE WATER
Job Address 1020-1142SKOELLERST
CITY OF OSHKOSH
No
118027
BUILDING PERMIT. APPLICATION AND RECORD
Owner KOELLER ONE LLC
Create Date
01/25/2006
Designer
Ron Kostus
Contractor
TENANT
Category
232 - Alteration Stores & Customer Service
Plan R6-03-0106
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const: 2B
Size
Unfinished/Basement
-----.2 Sq. Ft.
-----.2 Sq. Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Projection I
Finished/Living
Canopies
Garage
-----.2 Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature tore/ Interior alterations per State Approved plans. expansion of store space to the South. and division of store space on the North for
of Work future tenant space.
HVAC Contractor
UNKNOWN???
Plumbing Contractor
UNKNOWN
Electric Contractor
UNKNOWN????
Fees: Valuation
$261,000.00 Plan Approval
$0.00 Permit Fee Paid
$847.00 Park Dedication
$0.00
Issued By:
Date 01/30/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1308490000
In the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
Agent/Owner
OSHKOSH
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.