Loading...
HomeMy WebLinkAbout0118028 -Building (added work) e OSHKOSH ON THE WATER Job Address 829 DIVISION ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118028 Owner JOHN R RABE Create Date 01/30/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~sq.Ft. Bedrooms 0 Stories Garage ~sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain - # Dwelling Units ~ Height Permit Park Dedication # Structures ~ UseJNature Work in addition to permit 117891. Remove various partition walls, rearrange kitchen, abandon window in kitchen and bathroom, replace of Work rotted subfloor in bathroom. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval {J"" '/" $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: Date 01/30/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1005390000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure aryy ne ssary aR rovals before starling such activity. Signature j-¡"; Date Agent/Owner OSHKOSH WI 54902 - 6542 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Penmit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.