HomeMy WebLinkAbout0118023-HVAC (furnace)
~
OSHKOSH
ON THE WATER
Job Address 417W14THAVE
CITY OF OSHKOSH
No
118023
HVAC PERMIT -APPLICATION AND RECORD
Owner
LISA D MARTIN
Contractor
PREMIUM AIR INC
1,(1 Gas
D New
Category 500 - Residential-Heating & Ventilating
Create Date 01/30/2006
Plan
Fuel
I I Oil
I I Solar
I I Electric
[7] Replace
U Steam
I I Solid
System
n Other
Chimney Type
Heat Loss
~ Forced Air
I I Electric
U Chimney A
( ) As Approved
() As Per Plan
U Radiant
1 I Hot Water
I I Suppì.
U AlC I
I 1 Con. Bumer 1
( ) Not Applicabie
U Vent
( ) Chimney B
. Existing
. Direct Vent
BTU Rate
( ) Variable
( ) Not Applicable
. Other
Value
0
Value 80000
Use/Nature FRI Replace fumace, EIV provided by Premium Air - NO CHIMNEY LINER being installaed Where an appliance is permanently
of Work Isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior
f the CN and to provide the appliance or appliances served with the req. draft.
Fees: Valuation
$4,742.00
Plan Approval
$0.00
Permit Fee Paid
$77.00
Issued By:
Date 01/3012006
D Permit Voided I
Parcelld # 0907330000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address
N3225 HWY 15
HORTONVILLE
WI 54944-0
Telephone Number
920-982-3323
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.