Loading...
HomeMy WebLinkAbout0118023-HVAC (furnace) ~ OSHKOSH ON THE WATER Job Address 417W14THAVE CITY OF OSHKOSH No 118023 HVAC PERMIT -APPLICATION AND RECORD Owner LISA D MARTIN Contractor PREMIUM AIR INC 1,(1 Gas D New Category 500 - Residential-Heating & Ventilating Create Date 01/30/2006 Plan Fuel I I Oil I I Solar I I Electric [7] Replace U Steam I I Solid System n Other Chimney Type Heat Loss ~ Forced Air I I Electric U Chimney A ( ) As Approved () As Per Plan U Radiant 1 I Hot Water I I Suppì. U AlC I I 1 Con. Bumer 1 ( ) Not Applicabie U Vent ( ) Chimney B . Existing . Direct Vent BTU Rate ( ) Variable ( ) Not Applicable . Other Value 0 Value 80000 Use/Nature FRI Replace fumace, EIV provided by Premium Air - NO CHIMNEY LINER being installaed Where an appliance is permanently of Work Isconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in the interior f the CN and to provide the appliance or appliances served with the req. draft. Fees: Valuation $4,742.00 Plan Approval $0.00 Permit Fee Paid $77.00 Issued By: Date 01/3012006 D Permit Voided I Parcelld # 0907330000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address N3225 HWY 15 HORTONVILLE WI 54944-0 Telephone Number 920-982-3323 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.