Loading...
HomeMy WebLinkAbout0118029-Building (2nd fl remodel) 0 OSHKOSH ON THE WATER Job Address 403 W 10TH AVE CITY OF OSHKOSH No 118029 BUILDING PERMIT -APPLICATION AND RECORD OWner ALLEN J KYTOLA Create Date 01/30/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: VB Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms 0 Stories Canopies Signs 0 Garage ~Sq.Ft. Baths Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Park Dedication Not Required Flood Plain ~ # Dwelling Units -----.!1 Height Permit Not Required # Structures -----.!1 UseiNature ' UPLEXI @nd Fioor Remodel - Remove lath and plaster. install fire-blocking, headers over windows, replace windows, and install new of Work Insullation and drywall. ALL Structural work to be inspected prior to concealment. HVAC Contractor UNKNOWN??? UNKNOWN? .? Plumbing Contractor UNKNOWN Electric Contractor Fees: Valuation 0.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 01/30/2006 Final/O.P. 00/00/0000 0 PeOlnitVoided I Parcelld # 0906430000 In the perloOinance of this work I agree to perloOin all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perloOin the work described in this peOinit application within an easement, the City strongly urges the peOinit applicant to contact the easement ~~~d:~::~nd to secure ny necessary a pr v before starting such activity. Date / /30/06 I ' Agent/Owner Address 403 W 10TH AVE OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.