HomeMy WebLinkAbout0118029-Building (2nd fl remodel)
0
OSHKOSH
ON THE WATER
Job Address 403 W 10TH AVE
CITY OF OSHKOSH
No
118029
BUILDING PERMIT -APPLICATION AND RECORD
OWner ALLEN J KYTOLA
Create Date
01/30/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const: VB
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Signs
0
Garage
~Sq.Ft.
Baths
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Park Dedication
Not Required
Flood Plain ~
# Dwelling Units -----.!1
Height Permit Not Required
# Structures
-----.!1
UseiNature ' UPLEXI @nd Fioor Remodel - Remove lath and plaster. install fire-blocking, headers over windows, replace windows, and install new
of Work Insullation and drywall. ALL Structural work to be inspected prior to concealment.
HVAC Contractor
UNKNOWN???
UNKNOWN? .?
Plumbing Contractor
UNKNOWN
Electric Contractor
Fees: Valuation
0.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
Date 01/30/2006
Final/O.P. 00/00/0000
0 PeOlnitVoided I
Parcelld # 0906430000
In the perloOinance of this work I agree to perloOin all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perloOin the work
described in this peOinit application within an easement, the City strongly urges the peOinit applicant to contact the easement
~~~d:~::~nd to secure ny necessary a pr v before starting such activity. Date / /30/06
I '
Agent/Owner
Address 403 W 10TH AVE
OSHKOSH
WI 54902 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.