Loading...
HomeMy WebLinkAbout0118012-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 424 HOBBS AVE CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No 118012 Contractor KURT ZENTNER & SONS INC Category 411 - Residential-Water Heaters Bathtub 0 Whirlpool 0 lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 1 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 0 0 0 Water Softner local Waste Clothes Wshr Owner WilLIAM JII P PARSONS Create Date 01/27/2006 Plan 0 0 0 0 0 0 0 0 0 Wait St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 0 0 0 0 0 0 0 0 Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec 0 Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bidet Beer Tap lab Sink Sterilizer Dip Well Drink Ftn Use/Nature ofWork r~~-- -~.- Size Sanitary Sewer Storm Sewer Water Service Material Type # 0 0 0 0 0 Conn. Type Parcelld # 1209740000 $575.00 Plan Approval $20.00 0 Permit Voided I Valuation Issued By $0.00 Permit Fees Date 01/27/2006 In the performance of this work. I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 235-1340 Address 2860 OREGON ST AgenUOwner OSHKOSH WI 54902 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.