HomeMy WebLinkAbout0118011-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1841 GEORGIA ST
CITY OF OSHKOSH
PLUMBING PERMIT. APPLICATION AND RECORD
No
118011
Contractor KURT ZENTNER & SONS INC
Category 411 - Residential-Water Heaters
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 1
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
Owner DONALD E GADE
Create Date 01/27/2006
Plan
0
0
0
0
0
0
0
0
0
Wait.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0
0
0
0
0
0
0
0
0
Shamp Sink ~ Coffee Maker 0
FlrlWst Sink 0 Int Grease Trap 0
Catch Basin 0 Ext Grease Trap 0
Wash Ftn 0 RPZ Valve 0
Urinal 0 Eye Wash Statn 0
Standp Rec 0 Wtr Sewer Mtrs 0
Ice Maker 0 Deduct Meters 0
Gar Drain 0 Wtr Usage Mtrs 0
Soda Disp 0
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Use/Nature
of Work
r"œ""_~~~ ..._""'"
Size
Sanitary Sewer
Storm Sewer
Water Service
Material
Type
#
0
0
0
0
0
0
0
0
0
0
Conn. Type
Parcelld #
1412120000
Valuation
$575.00
Plan Approval
$20.00 0 Permit Voided I
Issued By
$0.00
Permit Fees
Date 01/27/2006
In the performance of this work. I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2860 OREGON ST
Telephone Number 235-1340
Agent/Owner
OSHKOSH
WI 54902 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.