Loading...
HomeMy WebLinkAbout0118018-HVAC (new system) e OSHKOSH ON THE WATER Job Address 20052045 W 20TH AVE CITY OF OSHKOSH No 118018 HVAC PERMIT -APPLICATION AND RECORD Owner DLJ HOLDINGS LLC Create Date 01/27/2006 Plan Contractor CONDON TOTAL COMFORT Category 512 -Ind. & Comm-Both 1 I Electric Fuel 1"'1 Gas [7] New I I Oil I I I Solar I I Solid [7] Replace U Steam I I Suppl. n Other System ~ Forced Air I 1 Electric ~ Radiant I I HotWater Heat Loss K ) As Approved K) As Per Plan ( ) Chimney B ( ) Existing () Direct Vent ~ AlC I 1 I Con. Bumer 1 . Not Applicable U Vent Chimney Type K) Chimney A BTU Rate () Variable . Not Applicable . Other Value 0 Value Use/Nature Install HV AC for factory addition and Office remodel.' Note: This permit is issued based on written assurance from Fox Cities Construction of Work at all required mechanical screening will be installed/completed by June 1, 2006.Also be reminded the design of the rooftop screening ust be proposed and accepted prior to installation. Failure to comply is subject to Municipal Citation issuance to Fox Cities Construction ncllor the owner. $79,000.00 Plan Approval $0.00 Permit Fee Paid $625.00 Issued By: Date 01/27/2006 D Permit Voided I Parcelld # 1326070000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvais before starting such activity. Signature Date AgenUOwner Address PO BOX 184 RIPON WI 54971 -184 Telephone Number 920-748-5050 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.