HomeMy WebLinkAbout0118018-HVAC (new system)
e
OSHKOSH
ON THE WATER
Job Address 20052045 W 20TH AVE
CITY OF OSHKOSH
No
118018
HVAC PERMIT -APPLICATION AND RECORD
Owner
DLJ HOLDINGS LLC
Create Date 01/27/2006
Plan
Contractor
CONDON TOTAL COMFORT
Category 512 -Ind. & Comm-Both
1 I Electric
Fuel
1"'1 Gas
[7] New
I I Oil
I
I I Solar
I I Solid
[7] Replace
U Steam
I I Suppl.
n Other
System
~ Forced Air
I 1 Electric
~ Radiant
I I HotWater
Heat Loss
K ) As Approved
K) As Per Plan
( ) Chimney B
( ) Existing
() Direct Vent
~ AlC I
1 I Con. Bumer 1
. Not Applicable
U Vent
Chimney Type K) Chimney A
BTU Rate
() Variable
. Not Applicable
. Other
Value
0
Value
Use/Nature Install HV AC for factory addition and Office remodel.' Note: This permit is issued based on written assurance from Fox Cities Construction
of Work at all required mechanical screening will be installed/completed by June 1, 2006.Also be reminded the design of the rooftop screening
ust be proposed and accepted prior to installation. Failure to comply is subject to Municipal Citation issuance to Fox Cities Construction
ncllor the owner.
$79,000.00
Plan Approval
$0.00
Permit Fee Paid
$625.00
Issued By:
Date 01/27/2006
D Permit Voided I
Parcelld # 1326070000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure any necessary approvais before starting such activity.
Signature
Date
AgenUOwner
Address
PO BOX 184
RIPON
WI 54971 -184
Telephone Number
920-748-5050
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.