HomeMy WebLinkAbout0117992 B
e
OSHKOSH
ON THE WATER
Job Address 519521 N MAIN ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117992
OWner LARRYJ BACKUS
Create Date
01/2612006
Designer
Contractor
PACKER VALLEY BUILDERS, INC
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories
Garage ----.2 Sq. Ft. Baths
0 Projection I
Canopies
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature Ylpartment/ Fire damage repair/ UNIT 4/ Replace drywall and 2 roof rafiers along with a header above a closet opening. A one (1) hour
of Work þjting shall be maintained between units.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$22,000.00 Plan Approval
Of)
$0.00 Permit Fee Paid
$130.00 Park Dedication
$0.00
Issued By:
Date 01/2612006
Final/O.P. 00/00/0000
0 PennitVoided I
Parcelld # 0700320000
In the performance of this work I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) an~ure an~y necessa~l<r,ÇY.?IJi. befo~tarting such activity.
Signature ~V~.b . ...- Date )(" / - ;;2 6'- CJ 6
Agent/Owner
Address 2Zi7 CLAIRVILLE ROAD
OSHKOSH
WI 54904 - 0000
Telephone Number
920-232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.