Loading...
HomeMy WebLinkAbout0117992 B e OSHKOSH ON THE WATER Job Address 519521 N MAIN ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117992 OWner LARRYJ BACKUS Create Date 01/2612006 Designer Contractor PACKER VALLEY BUILDERS, INC Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories Garage ----.2 Sq. Ft. Baths 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature Ylpartment/ Fire damage repair/ UNIT 4/ Replace drywall and 2 roof rafiers along with a header above a closet opening. A one (1) hour of Work þjting shall be maintained between units. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $22,000.00 Plan Approval Of) $0.00 Permit Fee Paid $130.00 Park Dedication $0.00 Issued By: Date 01/2612006 Final/O.P. 00/00/0000 0 PennitVoided I Parcelld # 0700320000 In the performance of this work I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an~ure an~y necessa~l<r,ÇY.?IJi. befo~tarting such activity. Signature ~V~.b . ...- Date )(" / - ;;2 6'- CJ 6 Agent/Owner Address 2Zi7 CLAIRVILLE ROAD OSHKOSH WI 54904 - 0000 Telephone Number 920-232-7620 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.