Loading...
HomeMy WebLinkAbout0117991-Building (bathroom ceiling) e OSHKOSH ON THE WATER Job Address 206-212W12THAVE CITY OF OSHKOSH No 117991 BUILDING PERMIT - APPLICATION AND RECORD Owner DALE M/SHERRY L HOTOVEC Create Date 01/2612006 Designer Contractor PACKER VALLEY BUILDERS, INC Category 223 - Alteration Offices, Banks, Professional Plan Type . Building 0 Sign Q Canopy 0 Fence Q Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures -----.2 Use/Nature Middle unit / Replace water damaged drywall and suspended ceiling in bathroom. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,500.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication Issued By: ~ $0.00 Date 01/26/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0901240000 In the performance of this work I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and t~se,;"r~ a~-í'~s~ary_~~~~I~..~~f'?'~rting such activity. Signature .,¿,;:),,~~/ -;2-....-.. Date ><- / - d:? ¡{', "CJ {; =---. Agent/Owner Address 2277 CLAIRVILLE ROAD OSHKOSH WI 54904 - 0000 Telephone Number 920-232-7620 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.