HomeMy WebLinkAbout0117991-Building (bathroom ceiling)
e
OSHKOSH
ON THE WATER
Job Address 206-212W12THAVE
CITY OF OSHKOSH
No
117991
BUILDING PERMIT - APPLICATION AND RECORD
Owner DALE M/SHERRY L HOTOVEC
Create Date
01/2612006
Designer
Contractor
PACKER VALLEY BUILDERS, INC
Category
223 - Alteration Offices, Banks, Professional
Plan
Type
. Building
0 Sign
Q Canopy
0 Fence
Q Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
-----.2
Use/Nature Middle unit / Replace water damaged drywall and suspended ceiling in bathroom.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2,500.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
Issued By:
~
$0.00
Date 01/26/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0901240000
In the performance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and t~se,;"r~ a~-í'~s~ary_~~~~I~..~~f'?'~rting such activity.
Signature .,¿,;:),,~~/ -;2-....-.. Date ><- / - d:? ¡{', "CJ {;
=---. Agent/Owner
Address 2277 CLAIRVILLE ROAD
OSHKOSH
WI 54904 - 0000
Telephone Number
920-232-7620
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.