Loading...
HomeMy WebLinkAbout0117973-Building I" e OSHKOSH ON T'HE WATER Job Address 3135 HALLIE HOLLOW CT CITY OF OSHKOSH No 117973 BUILDING PERMIT - APPLICATION AND RECORD Owner THEODORE AIPAME MILLER Create Date 01/25/2006 Desi9ner Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ------2 Sq. Ft. ------2 Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ------2 Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature SFRI LATE PERMIT/ Finishing a bathroom in the basement and installing a wall to close off the laundry room. An exhaust fan will be of Work installed. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ili $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 01/25/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1343680000 in the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ~~ ne'ì(~s~\YlÍ'ppro~before starting such activity. I } Signature f ~/ .")~ \ ",-< Date r\ ~ !,. Agent/Owner Address 3135HALLIEHOLLOWCT OSHKOSH WI 54904 - 6302 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.