HomeMy WebLinkAbout0117973-Building
I"
e
OSHKOSH
ON T'HE WATER
Job Address 3135 HALLIE HOLLOW CT
CITY OF OSHKOSH
No
117973
BUILDING PERMIT - APPLICATION AND RECORD
Owner THEODORE AIPAME MILLER
Create Date
01/25/2006
Desi9ner
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
------2 Sq. Ft.
------2 Sq. Ft.
Rooms
0
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
------2 Sq. Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature SFRI LATE PERMIT/ Finishing a bathroom in the basement and installing a wall to close off the laundry room. An exhaust fan will be
of Work installed.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ili
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 01/25/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1343680000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work
described in this pennit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ~~ ne'ì(~s~\YlÍ'ppro~before starting such activity. I }
Signature f ~/ .")~ \ ",-< Date r\ ~ !,.
Agent/Owner
Address 3135HALLIEHOLLOWCT
OSHKOSH
WI 54904 - 6302
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.