HomeMy WebLinkAbout0117955-Plumbing (drain)
0 CITY OF OSHKOSH No 117955
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1736 SANDERS ST Owner MICHAEUCOLLEEN STADLER Create Date 01/24/2006
Contractor WELLNITZ PLUMBING Category 410 - Residential-Interior Plan
Bathtub 0 Shower 0 Water Softner 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 1 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 1 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 1 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
eplace underground building drain "debit acct
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1410090700
$28.00 0 Pennit Voided I
Valuation
$2.000.00
Plan Approval
$0.00
Permit Fees
Issued By
Date 01/24/2006
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongiy urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address 4810 AMBERWOOD LN
APPLETON
WI 54915 - 0000
Telephone Number (0)231-7390
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
------.J