Loading...
HomeMy WebLinkAbout0117970-Building (foundation) e OSHKOSH ON THE WATER Job Address 1850 FABRY ST CITY OF OSHKOSH No 117970 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN D/PATRICIA WOLFF LIFE ESTATE Create Date 01/24/2006 Designer Contractor SURE-DRY-BASEMENT SYSTEMS INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----2 Sq. Ft. -----2 Sq. Ft. Rooms 0 Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies 0 Signs 0 Garage -----2 Sq. Ft. Baths Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood OOtl1er Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units -----.i1 # Structures 0 Use/Nature ofWork FRI Repair tI1e north foundation wall using grip tite wall anchors. Plumbing Contractor HVAC Contractor Electric Contractor $2,625.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 01/2412006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1409942700 In the performance of this work i agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform tI1e work described in this permit application witl1in an easement, tI1e City strongly urges the permit applicant to contact the easement hoider(s) and to secure any necessary approvals before starting such activity. Si9nature )<.. ~/.':erM.jc. :::;ç;/,~ Date x I!ZS/Oh Agent/Owner Address 754 W AIRPORT RD MENASHA WI 54952 - 1409 Telephone Number 920.967.9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.