Loading...
HomeMy WebLinkAbout0117925-Building 0 CITY OF OSHKOSH No 117925 OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD ON THE WATER Job Address 307 S SAWYER ST Owner LUANN M RODRIGUEZ Create Date 01/19/2006 Designer Contractor HEARTLAND HOMES CONSTRUCTION LLC Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. -----.2 Sq. Ft. Rooms 0 Height 0 FI. 'Bedrooms 0 Stories Baths 0 D Projection I Finished/Living Canopies Garage -----.2 Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Structures Park Dedication # Dwelling Units 0 0 Use/Nature SFRI Remodeling the kitchen and bathroom. No structurai work. New cabinets and fixtures. of Work HVAC Contractor Plumbing Contractor BARTELT PLUMBING Electric Contractor CUMINGß ELECTRIC INC $10.500.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication Fees: Valuation Issued By: it-"""" $0.00 Date 01/19/2006 Final/O.P. 00/00/0000 D Penmit Voided I Parcelld # 0610060000 In the perfonmance of this work I agree to perfonm ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure a ecessary approvals before starting such activity. I )!7/cU. , Date AgenVOwner OSHKOSH Wi 54904 - 0000 Telephone Number 920-233-7564 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.