HomeMy WebLinkAbout0117925-Building
0 CITY OF OSHKOSH No 117925
OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD
ON THE WATER
Job Address 307 S SAWYER ST Owner LUANN M RODRIGUEZ Create Date 01/19/2006
Designer
Contractor
HEARTLAND HOMES CONSTRUCTION LLC
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-----.2 Sq. Ft.
-----.2 Sq. Ft.
Rooms 0 Height 0 FI.
'Bedrooms 0 Stories
Baths 0
D Projection I
Finished/Living
Canopies
Garage
-----.2 Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Structures
Park Dedication
# Dwelling Units 0
0
Use/Nature SFRI Remodeling the kitchen and bathroom. No structurai work. New cabinets and fixtures.
of Work
HVAC Contractor
Plumbing Contractor
BARTELT PLUMBING
Electric Contractor
CUMINGß ELECTRIC INC
$10.500.00 Plan Approval
$0.00 Permit Fee Paid
$79.00 Park Dedication
Fees: Valuation
Issued By: it-""""
$0.00
Date 01/19/2006
Final/O.P. 00/00/0000
D Penmit Voided I
Parcelld # 0610060000
In the perfonmance of this work I agree to perfonm ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure a ecessary approvals before starting such activity.
I )!7/cU.
,
Date
AgenVOwner
OSHKOSH
Wi 54904 - 0000
Telephone Number
920-233-7564
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.