Loading...
HomeMy WebLinkAbout0117905 P ~~. OSHKOSH ON THE WATER Job Address 2836 STONEY BEACH ST CITY OF OSHKOSH No 117905 PLUMBING PERMIT - APPLICATION AND RECORD Owner DONALD J MINNIECHESKE Plan Contractor KOCH PLUMBING Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Disposal Res. Sink 0 Dishwasher Bar Sink 0 Sump Pump Water Heater 0 Classrm Sink Site Drain 0 Breakrm Sink Roof Drain 0 Ejector/Grind Misc. 0 Fixtures Create Date 01/18/2006 Category 401 - Residential-Exterior (laterals) 0 Water Softner 0 Local Waste 0 Clothes Wshr 0 Bidet 0 Beer Tap 0 Lab Sink 0 Sterilizer 0 Dip Well 0 Drink Ftn 0 0 0 0 0 0 0 0 0 Wait.St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink -----.2 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker -----.2 Int Grease Trap -----.2 Ext Grease Trap -----.2 RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature ofWork r"~"~'."-' "debit acet Sanitary Sewer Size 4" # Storm Sewer Water Service Material Plastic Type Lateral Conn. Type 1 Aband 0 0 0 0 Parcelld # 1414980000 Valuation $160.00 $0.00 $50.00 D Permit Voided i Plan Approval Issued By Permit Fees Date 01/18/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which It Is not a party, if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2005 DOTY ST Agent/Owner OSHKOSH Telephone Number 920-231-6661 or 235 WI 54902 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.