HomeMy WebLinkAbout0117905 P
~~.
OSHKOSH
ON THE WATER
Job Address 2836 STONEY BEACH ST
CITY OF OSHKOSH
No
117905
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DONALD J MINNIECHESKE
Plan
Contractor KOCH PLUMBING
Bathtub 0 Shower
Whirlpool 0 Floor Drain
Lavatory 0 Lndry Tray
Toilet 0 Disposal
Res. Sink 0 Dishwasher
Bar Sink 0 Sump Pump
Water Heater 0 Classrm Sink
Site Drain 0 Breakrm Sink
Roof Drain 0 Ejector/Grind
Misc. 0
Fixtures
Create Date 01/18/2006
Category 401 - Residential-Exterior (laterals)
0 Water Softner
0 Local Waste
0 Clothes Wshr
0 Bidet
0 Beer Tap
0 Lab Sink
0 Sterilizer
0 Dip Well
0 Drink Ftn
0
0
0
0
0
0
0
0
0
Wait.St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink -----.2
0 FlrlWst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker -----.2
Int Grease Trap -----.2
Ext Grease Trap -----.2
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
ofWork
r"~"~'."-'
"debit acet
Sanitary Sewer
Size
4"
#
Storm Sewer
Water Service
Material
Plastic
Type
Lateral
Conn. Type
1 Aband
0
0
0
0
Parcelld #
1414980000
Valuation
$160.00
$0.00
$50.00 D Permit Voided i
Plan Approval
Issued By
Permit Fees
Date 01/18/2006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It Is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2005 DOTY ST
Agent/Owner
OSHKOSH
Telephone Number 920-231-6661 or 235
WI 54902 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.