Loading...
HomeMy WebLinkAboutBuilding Field Notice - 2/28/2005 '. p .~.~ City of Oshkosh Inspection Services Division 215 Church Avenue, PO Box 1130 Oshkosh, WI 54903-1130 Phone: (920) 236-5050 Fax (920) 236-5084 CORRECTION NOTICE I FIELD INSPECTION REPORT lRCCAkJ q'* CONTRACTOR: D ~LZ- PROJECT TO BE INSPECTED: ~"ÏA. TYPE OF INSPECTION: -=?v ß-U:) ~ JOB LOCATION: Violations must be corrected and approved within 30 days unless otherwise noted. Call for re-inspections prior to concealment and/or occupancy. Upon completing the corrections, the owner/contractor/agent must sign and date at the bottom of this notice and return it to the Inspection Services Division by the Compliance Date of INSPECTIONR):SVLTS "'\l-~~~ \D cS..z~~ ~Q.òL "- ~"l.~ <R~ ~( ~~ Ji?!r.\tÅ’NfS:t:;,.¡I:hi"..... . .!.':::l!:;.,!:",iw: :;::APrr~OVe&InsP.Rep3'f;;J~)íMrU ~~ d-~dæ:d Inspection Services Division Date ofInspection Phone # ~ Print Name Company Signature: Date ~/ ~~l~'B"'iO~' TJ-Beam@616S"ial ""mb,,' 7003007686 U", 1 2/22/20053.2623 PM Page 1 EogiooV""o",,6,5 NEW HEADER 3 Pcs of 13/4" x 11 7/S" 1,9E Microllam@ LVL THIS PRODUCT MEETS OR EXCEEDS THE SET DESIGN CONTROLS FOR THE APPLICATION AND LOADS LISTED J [!J~ ! 14' 3" L ~@J . Product [)i.gram is Conceptu.I, LOADS: Analysis is for a Header (Flush Beam) Member, Tributary Load Width: 10' Primary Load Group - Residential- Living Areas (psf): 40.0 Live at 100 % duration, 12.0 Dead SUPPORTS: Input Bearing Vertical Reactions (Ibs) Detail Other Width Length LivelDead/UpliftlTotal 1 Stud wall 3.50" 1.72" 2850/978/0/3828 A3: Rim Board 1 Ply 1 1/4" x 11 7/8" 0.8E T J-Strand Rim Board@ 2 Stud wall 3.50" 1.72" 2850/978/0/3828 A3: Rim Board 1 Ply 1 1/4" x 11 7/8" 0.8E T J-Strand Rim Board@ -See TJ SPECIFIER'S 1 BUILDERS GUIDE for detail(s): A3: Rim Board DESIGN CONTROLS: Maximum Design Control Shear (Ibs) 3738 -3139 11845 Moment (Ft-Lbs) 13006 13006 26772 Live Load Defl (in) 0.261 0.348 Total Load Defl (in) 0.351 0.696 -Deflection Criteria: STANDARD(LLL/480,TL:L/240). -Bracing(Lu): All compression edges (top and bottom) must be braced at 10' 6" o/c unless detailed otherwise. lateral bracing is required to achieve member stability. Control Passed (27%) Passed (49%) Passed (L/639) Passed (L/476) Location Rt. end Span 1 under Floor loading MID Span 1 under Floor loading MID Span 1 under Floor loading MID Span 1 under Floor loading Proper attachment and positioning of ADDITIONAL NOTES: -IMPORTANT! The analysis presented is output from software developed by Trus Joist (T J). T J warrants the sizing of its products by this software will be accomplished in accordance with T J product design criteria and code accepted design vaiues. The specific product application, input design loads, and stated dimensions have been provided by the software user. This output has not been reviewed by a T J Associate. -Not all products are readily available. Check with your supplier or T J technical representative for product availability, -THIS ANAL VSIS FOR TRUS JOIST PRODUCTS ONL V! PRODUCT SUBSTITUTION VOIDS THIS ANAL VSIS. -Allowable Stress Design methodology was used for Building Code UBC analyzing the T J Distribution product listed above. -Note: See TJ SPECIFIER'S 1 BUILDER'S GUIDES for multiple ply connection. PROJECT INFORMATION: LEE TRITT 689 W 19TH OPERATOR INFORMATION: BEN STELLMACHER NOFFKE LUMBER INC. 1601 BOWEN STREET OSHKOSH, WI 54901 Phone: (920)235-3080 Fax: (920)235-3061 ben@noffkelumber.com Cepy",g", C 200. Mic'OUem" " e /cQJ'-\'\\V \x~vrQ ~