Loading...
HomeMy WebLinkAbout2006-Building e OSHKOSH ON THE WATER Job Address 3817 PURPLE CREST DR CITY OF OSHKOSH No 117894 BUILDING PERMIT - APPLICATION AND RECORD Owner MICHAEL J/KRIST NESTERICK Create Date 01/17/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication 1# Dwelling Units ~ 1# Structures ~ Use/Nature SFRI Finishing off a portion of the basement for a family room. All construction shall comply with local and state building code ofWork equirements. HVAC Contractor UNKNOWN??? Plumbing Contractor Electric Contractor ZIMMER ELECTRIC INC Fees: Valuation Issued By: ~ $7,000.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Date 01/17/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld 1# 1261750000 in the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and t ecure any necessary approvals before starting such activity. ~ Signature ' . -r - 0 I I II lo(p OSHKOSH WI 54901 - 8213 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.