HomeMy WebLinkAbout2006-Building
e
OSHKOSH
ON THE WATER
Job Address 3817 PURPLE CREST DR
CITY OF OSHKOSH
No
117894
BUILDING PERMIT - APPLICATION AND RECORD
Owner MICHAEL J/KRIST NESTERICK
Create Date
01/17/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
1# Dwelling Units ~
1# Structures
~
Use/Nature SFRI Finishing off a portion of the basement for a family room. All construction shall comply with local and state building code
ofWork equirements.
HVAC Contractor
UNKNOWN???
Plumbing Contractor
Electric Contractor
ZIMMER ELECTRIC INC
Fees: Valuation
Issued By: ~
$7,000.00 Plan Approval
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Date 01/17/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld 1# 1261750000
in the performance of this work I agree to perfonm all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and t ecure any necessary approvals before starting such activity. ~
Signature ' . -r - 0 I I II lo(p
OSHKOSH
WI 54901 - 8213
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.