HomeMy WebLinkAbout0117891-Building
-0
OSHKOSH
ON THE WATER
Job Address 829 DIVISION ST
CITY OF OSHKOSH
No
117891
BUILDING PERMIT. APPLICATION AND RECORD
Owner JOHN R RASE
Create Date
01/17/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Buildln9
0 Sign
0 Canopy
0 Fence
0 Raze
~
Zoning
Class of Const:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories
Garage ----2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRI Remodeling the kitchen and bathroom to include removing a non-load bearing wall between the kitchen and current bedrrom to be
of Work converted to a dining area, closing in a bathroom window re-drywalling.
HVAC Contractor
Plumbing Contractor
Electric Contractor
WITZKE ELECTRIC INC
Fees: Valuation
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
Date 01/17/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1005390000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ar necessary approvals before starting such activity.
Signature .,( /7..","'1/;-1 ~>t"';
. f i . Agent/OWner
Date
J«
Address 1264 W SOUTH PARK AVE
OSHKOSH
WI 54902 - 6642
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.