Loading...
HomeMy WebLinkAbout0117891-Building -0 OSHKOSH ON THE WATER Job Address 829 DIVISION ST CITY OF OSHKOSH No 117891 BUILDING PERMIT. APPLICATION AND RECORD Owner JOHN R RASE Create Date 01/17/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Buildln9 0 Sign 0 Canopy 0 Fence 0 Raze ~ Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRI Remodeling the kitchen and bathroom to include removing a non-load bearing wall between the kitchen and current bedrrom to be of Work converted to a dining area, closing in a bathroom window re-drywalling. HVAC Contractor Plumbing Contractor Electric Contractor WITZKE ELECTRIC INC Fees: Valuation $10,000.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 01/17/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1005390000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ar necessary approvals before starting such activity. Signature .,( /7..","'1/;-1 ~>t"'; . f i . Agent/OWner Date J« Address 1264 W SOUTH PARK AVE OSHKOSH WI 54902 - 6642 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.