HomeMy WebLinkAbout0117895-HVAC (furnace)
e
OSHKOSH
ON THE WATER
Job Address 1700ALGOMABLVD
CITY OF OSHKOSH
No
117895
HVAC PERMIT - APPLICATION AND RECORD
OWner
PAMELA J SOMMERFELD
Create Date 01/17/2006
Plan
Contractor
Fuel
HARRIS MICHAEL R
1"'1 Gas
D New
Category 600 - Residential-Heating & Ventilating
I I Oil
I I Electric
[7] Replace
U Steam
I I Suppl.
I I Solar
I I Solid
System
n Other
U Radiant
I I Hot Water
l"J Forced Air
I I Electric
Chimney Type
K) Chimney A
K) As Approved
K ) As Per Plan
( ) Chimney B
. Existing
. Direct Vent
U AlC I
I I Con. Burner I
( ) Not Applicable
U Vent
BTU Rate
( ) Variable
( ) Not Applicable
. Other
Value
Heat Loss
Value
Use/Nature FRI Replace furnace, No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE
of Work No Chimney Liner being installed -Where an appliance is permanently disconnected from an existing chimney or vent (CN), the CN
hall be resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances served
ith the req. draft.
Fees: Valuation
$2,148.00
Plan Approval
$0.00
Permit Fee Paid
$38.00
Issued By:
Date 01/17/2006
D Permit Voided I
Parcelld # 1200270000
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenUOwner
Address
311 ROLLING MEADOWS DR
FOND DU LAC
WI 54937-0
Telephone Number
929-6100
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.