Loading...
HomeMy WebLinkAbout0117895-HVAC (furnace) e OSHKOSH ON THE WATER Job Address 1700ALGOMABLVD CITY OF OSHKOSH No 117895 HVAC PERMIT - APPLICATION AND RECORD OWner PAMELA J SOMMERFELD Create Date 01/17/2006 Plan Contractor Fuel HARRIS MICHAEL R 1"'1 Gas D New Category 600 - Residential-Heating & Ventilating I I Oil I I Electric [7] Replace U Steam I I Suppl. I I Solar I I Solid System n Other U Radiant I I Hot Water l"J Forced Air I I Electric Chimney Type K) Chimney A K) As Approved K ) As Per Plan ( ) Chimney B . Existing . Direct Vent U AlC I I I Con. Burner I ( ) Not Applicable U Vent BTU Rate ( ) Variable ( ) Not Applicable . Other Value Heat Loss Value Use/Nature FRI Replace furnace, No EIV provided - A SEPARATE ELECTRICAL PERMIT IS REQUIRED FOR CONNECTION OF THIS APPLIANCE of Work No Chimney Liner being installed -Where an appliance is permanently disconnected from an existing chimney or vent (CN), the CN hall be resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances served ith the req. draft. Fees: Valuation $2,148.00 Plan Approval $0.00 Permit Fee Paid $38.00 Issued By: Date 01/17/2006 D Permit Voided I Parcelld # 1200270000 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 311 ROLLING MEADOWS DR FOND DU LAC WI 54937-0 Telephone Number 929-6100 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.