HomeMy WebLinkAbout0117874 B
~
OSHKOSH
ON THE WATER
Job Address 1919 W LINWOOD AVE
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
117874
OWner MOR EQUITY INC
Create Date
01/13/2006
Designer
Contractor
HHH BUILDERS LLC
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories
Garage ----.2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units _---.!1
# Structures
~
Use/Nature SFRI Replacing the basement stairs and the stairs to the 2nd floor using the existing stairwel opening. The rear door will be replaced
of Work nd raised up.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2,000.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
~
Date 01/13/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1213400000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application wit. an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessa approvals before starting such activity.
Signature ~ c/ <
Date
)( J~/3-ó (p
Address 1698 COUNTY ROAD I
Agent/Owner
Oshkosh
WI 54902 - 0000 Telephone Number
605-0049
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.