Loading...
HomeMy WebLinkAbout0117874 B ~ OSHKOSH ON THE WATER Job Address 1919 W LINWOOD AVE CITY OF OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD No 117874 OWner MOR EQUITY INC Create Date 01/13/2006 Designer Contractor HHH BUILDERS LLC Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories Garage ----.2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units _---.!1 # Structures ~ Use/Nature SFRI Replacing the basement stairs and the stairs to the 2nd floor using the existing stairwel opening. The rear door will be replaced of Work nd raised up. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Issued By: ~ Date 01/13/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1213400000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application wit. an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessa approvals before starting such activity. Signature ~ c/ < Date )( J~/3-ó (p Address 1698 COUNTY ROAD I Agent/Owner Oshkosh WI 54902 - 0000 Telephone Number 605-0049 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.