Loading...
HomeMy WebLinkAbout0117872-Building (porch steps) 0 OSHKOSH ON THE WATER Job Address 1501 OREGON ST CITY OF OSHKOSH No 117872 BUILDING PERMIT. APPLICATION AND RECORD Owner STEPHEN R NELSON ETAL Create Date 01/12/2006 Contractor OWNER Designer Category 141- Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ---.!! Sq. Ft. ---.!! Sq. Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 0 Garage ---.!! Sq. Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature DUPLEX/Installing two sets of steps off the front porch. Code compliant handrails are required. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: valuatiok Issued By: l $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 01/12/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0902050000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature )Q. .$~ ( Address 1501 OREGON ST AgenUOWner OSHKOSH Dat~/ -1:< -oS WI 54902 - 6919 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. " ,