HomeMy WebLinkAbout0117872-Building (porch steps)
0
OSHKOSH
ON THE WATER
Job Address 1501 OREGON ST
CITY OF OSHKOSH
No
117872
BUILDING PERMIT. APPLICATION AND RECORD
Owner STEPHEN R NELSON ETAL
Create Date
01/12/2006
Contractor
OWNER
Designer
Category
141- Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
---.!! Sq. Ft.
---.!! Sq. Ft.
Rooms
Height 0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
0
0
Garage
---.!! Sq. Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature DUPLEX/Installing two sets of steps off the front porch. Code compliant handrails are required.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: valuatiok
Issued By: l
$500.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 01/12/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0902050000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature )Q. .$~
(
Address 1501 OREGON ST
AgenUOWner
OSHKOSH
Dat~/ -1:< -oS
WI 54902 - 6919
Telephone Number
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
"
,