HomeMy WebLinkAbout0117859-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1690 CLlFFVIEW DR
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
117859
Owner CHARLES/MARY HERTEL
Cate90ry 411 - Residential-Water Heaters
Contractor MERTEN PLUMBING
Create Date 01/11/2006
Plan
Bathtub 0 Shower 0 Water Softner 0 Wait. 51. 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0
Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind Drink Ftn 0 Serv Sink 0
Misc. 0
Fixtures
Shamp Sink ~
FlrlWst Sink 0
Catch Basin ~
Wash Ftn 0
Urinal 0
Standp Rec ~
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker ~
Int Grease Trap ~
Ext Grease Trap ~
RPZValve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
ofWork
I'~~"'- ~,~~
Size
Material
Type
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
#
0
0
0
0
0
Parcelld #
1524690000
Valuation
$1,185.00
$0.00
$20.00 0 Permit Voided ¡
Permit Fees
Plan Approval
Issued By
Date 01/11/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1076 COZY LN
AgenUOwner
OSHKOSH
WI 54901 - 0000
Telephone Number 231-6795
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.