Loading...
HomeMy WebLinkAbout0117828-Building e OSHKOSH ON THE WATER Job Address 1214 SPRUCE ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117828 OWner GORDON ElB SUSA MAXWELL Create Date 01/10/2006 Designer Contractor JIM BAUER CARPENTRY AND CONSTRUCTIO Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ----2 Sq. Ft. ----2 Sq. Ft. Rooms ----2 Height 0 Ft. Bedrooms 0 Stories Baths 0 0 Projection I Finished/Living Canopies 0 Garage ----2 Sq. Ft. Signs ----2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFRI Adding a fuil bathroom to the basement. The minimum ceiling height shail be 1'-0". of Work Plumbing Contractor SAMMONS PLUMBING HVAC Contractor Electric Contractor SLlM'S ELECTRIC INC Fees: Valuation $3.750.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Issued By: ~ Date 01/10/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1205940000 In the performance of this work I agree to perform ail work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy, if you perform the work described in this permit plication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu a y necessa a pr S before starting such activity. Signature ')( c¡J Date .A" /-/O-()' Agent/Owner WINNECONNE """'- 54986 - 0000 Telephone Number 920-582-7740 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.