HomeMy WebLinkAbout0117828-Building
e
OSHKOSH
ON THE WATER
Job Address 1214 SPRUCE ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117828
OWner GORDON ElB SUSA MAXWELL
Create Date
01/10/2006
Designer
Contractor
JIM BAUER CARPENTRY AND CONSTRUCTIO
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms ----2 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Projection I
Finished/Living
Canopies 0
Garage
----2 Sq. Ft.
Signs
----2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFRI Adding a fuil bathroom to the basement. The minimum ceiling height shail be 1'-0".
of Work
Plumbing Contractor
SAMMONS PLUMBING
HVAC Contractor
Electric Contractor
SLlM'S ELECTRIC INC
Fees: Valuation
$3.750.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Issued By:
~
Date 01/10/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1205940000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pariy, if you perform the work
described in this permit plication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu a y necessa a pr S before starting such activity.
Signature ')( c¡J
Date .A" /-/O-()'
Agent/Owner
WINNECONNE
"""'- 54986 - 0000 Telephone Number
920-582-7740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.