Loading...
HomeMy WebLinkAbout0117817-Plumbing (lav) e OSHKOSH ON THE WATER Job Address 2040 MENOMINEE DR Contractor J RASMUSSEN PLUMBING INC CITY OF OSHKOSH No 117817 PLUMBING PERMIT - APPLICATION AND RECORD Category 410 - Residential-Interior Create Date ~ Plan Owner JAMES D/SALL Y B SHARPE REV TRUST Bathtub 0 Shower ~ Water Softner 0 Wait.SI. ~ Shamp Sink ~ Coffee Maker ~ Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink ~ Int Grease Trap 0 Lavatory 1 Lndry Tray ~ Clothes Wshr 0 Exam Sink ~ Catch Basin ~ Ex! Grease Trap ~ Toilet 0 Disposal ~ Bidet 0 Sculry Sink ~ Wash Ftn 0 RPZValve ~ Res. Sink 0 Dishwasher ~ BeerTap 0 Hand Sink ~ Urinal ~ Eye Wash Statn ~ Bar Sink 0 Sump Pump ~ Lab Sink 0 Plaster Sink 0 Standp Rec ~ Wtr Sewer Mtrs ~ Water Heater 0 Classrm Sink ~ Sterilizer 0 Surgeons Sink ~ Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink ~ DipWell 0 F Prep Sink ~ Gar Drain ~ Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind ~ Drink Ftn 0 Serv Sink 0 Soda Disp ~ Misc. 0 Fixtures Use/Nature ofWork r~~' ~'" = Material # 0 0 0 0 0 Size Type Conn. Type I Sanitary Sewer Storm Sewer Water Service Parcelld # 1512030000 Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Issued By Date 01/09/2006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restJictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Date Signature AgenUOwner OSHKOSH WI 54904 .0000 Telephone Number 920-233-6747 Address 1914 GREENBRiAR TRL To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.