HomeMy WebLinkAbout0117759-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 314 SHORE LANE ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117759
Owner SUSAN K SCHMIDT
Create Date
01/04/2006
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~ Sq. Ft. Baths 0
D Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain -
# Dwelling Units --..!1
Height Penmit
Park Dedication
# Structures
--..!1
Use/Nature SFRIlnstalling replacement windows, same size and location.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation -
Issued By: ~
$1,500.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 01/05/2006
FinaI/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0206000000
In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1224 W SOUTH PARK AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.