Loading...
HomeMy WebLinkAbout0117759-Building (windows) e OSHKOSH ON THE WATER Job Address 314 SHORE LANE ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117759 Owner SUSAN K SCHMIDT Create Date 01/04/2006 Designer Contractor DAN V BINDER CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths 0 D Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain - # Dwelling Units --..!1 Height Penmit Park Dedication # Structures --..!1 Use/Nature SFRIlnstalling replacement windows, same size and location. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation - Issued By: ~ $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 01/05/2006 FinaI/O.P. 00/00/0000 D Permit Voided I Parcelld # 0206000000 In the perfonmance of this work I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1224 W SOUTH PARK AVE AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number 231-2114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.