HomeMy WebLinkAbout2006-Plumbing (toilet)
e
OSHKOSH
ON THE WATER
Job Address 408 REICHOW ST
CITY OF OSHKOSH
No
117767
PLUMBING PERMIT - APPLICATION AND RECORD
OWner EVERETT USANTH GOODWIN
Create Date 01/05/2006
Plan
Contractor SAMMONS PLUMBING
Category 410 - Residential-Interior
Bathtub 0 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0
Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Coffee Maker 0
Int Grease Trap -----9.
Ext Grease Trap -----9.
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Use/Nature
of Work
I'~="W'OC~ -"æ"~
Size
Material
Type
#
Conn. Type
Sanitary Sewer
0
0
0
0
0
Storm Sewer
Water Service
Parcelld #
0611140000
Valuation
$500.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Issued By
Date 01/05/2006
In the performance of this work. I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522W. MURDOCK AVE
Agent/Owner
OSHKOSH
WI 54901 - 2298
Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.