Loading...
HomeMy WebLinkAbout0117773-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 2725 NEWPORT AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 117773 Contractor SAMMONS PLUMBING Owner JESSE L ANDERSEN Create Date 01/05/2006 0 WaterSoftner Category 411 - Residential-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work 0 Shower 0 Floor Drain 0 Lndry Tray 0 Disposal 0 Dishwasher 0 Sump Pump 1 Classrm Sink 0 Breakrm Sink 0 Ejector/Grind 0 I'~~""' -'æ"~ 0 0 0 0 0 0 0 0 Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Plan 0 0 0 0 0 0 0 0 0 Wait.St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap 0 RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Dip Well Drink Ftn Valuation Issued By Sanitary Sewer Size Storm Sewer Water Service Material Type # 0 0 0 0 0 $0.00 Permit Fees Conn. Type Parcelld # 1318700000 $600.00 Plan Approval Address 522 W. MURDOCK AVE AgenUOwner OSHKOSH WI 54901 - 2298 $20.00 D Permit Voided I Date 01/05/2006 In the performance of this work, I agree to perform all work pursuant to rules govemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.