Loading...
HomeMy WebLinkAbout0117784 B G OSHKOSH ON THE WATER Job Address 417WLlNCOLNAVE CITY OF OSHKOSH No 117784 BUILDING PERMIT - APPLICATION AND RECORD Owner DIANE K LLOYD Create Date 01/05/2006 Designer Contractor LEAD-SAFE SERVICES INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature SFRI Replace 18 storm windows, 2 storm doors, and rear primary door. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,000.00 Plan Approval $0.00 Permit Fee Paid $74,00 Park Dedication $0.00 Issued By: Date 01/0512006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0500680000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 3905 COUNTY RD II #36 Agenl/Owner LARSEN WI 54947 - 3513 Telephone Number 850-5043 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received, Work may continue if the inspection is not performed within two business days from the time the project is ready.