Loading...
HomeMy WebLinkAbout0117783-Building (windows) e OSHKOSH ON THE WATER Job Address 1938ALGOMABLVD CITY OF OSHKOSH No 117783 BUILDING PERMIT - APPLICATION AND RECORD Owner ROLAND USUSAN NEABLING Create Date 01/05/2006 Designer Contractor LUECKS HOME IMPROVEMENT INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Cariopy 0 Fence 0 Raze Class of Const: Size Rooms 0 Height 0 Ft. 0 Projection I Bedrooms 0 Stories Canopies 0 Baths 0 Signs 0 0 Pier 0 Other 0 Treated Wood Flood Plain No Height Penmit Not Required # Dwelling Units ------9. # Structures ------9. Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Finished/Living Garage ~Sq.Ft. Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Park Dedication Not Required Use/Nature ofWork omm/ Replacing 8 windows with vinyl windows - NO STRUCTURAL WORK Plumbing Contractor HVAC Contractor Electric Contractor $4,520.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 01/05/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1213350000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 706 S MAIN STREET Agent/Owner OSHKOSH WI 54902 - 6084 Telephone Number 235-0106 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.