HomeMy WebLinkAbout0117745 B
G
OSHKOSH
ON THE WATER
Job Address 2534 VILLAGE LN #E
CITY OF OSHKOSH
No
117745
BUILDING PERMIT - APPLICATION AND RECORD
Owner RAYMOND G SCHARPF
Create Date
01/04/2006
Designer
Contractor
G F RUPPEL CONSTRUCTION
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ------.2 Sq. Ft. Bedrooms 0 Stories
Garage ------.2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature CONDO/ Remodeling the kitchen- new cabinets and countertops. Removing a section of a non-bearing wall in the kitchen to open up this
of Work rea up to the dining room.
HVAC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor
DREXLER ELECTRIC
Fees: VaIUa\i°'ll ,-
Issued By: NA.
$25,000.00 Plan Approval
$0.00 Permit Fee Paid
$139.00 Park Dedication
$0.00
Date 01/04/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 1320910000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit appiicant to contact the easement
holder(s) and 0 secu ny necessary provals ore starting such activity.
Signatur
Agent/OWner
OSHKOSH
Date ~ /-¥-CJb"
WI 54902 - 0000 Telephone Number 920-235-6710,585-31
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.