Loading...
HomeMy WebLinkAbout0117745 B G OSHKOSH ON THE WATER Job Address 2534 VILLAGE LN #E CITY OF OSHKOSH No 117745 BUILDING PERMIT - APPLICATION AND RECORD Owner RAYMOND G SCHARPF Create Date 01/04/2006 Designer Contractor G F RUPPEL CONSTRUCTION Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ------.2 Sq. Ft. Bedrooms 0 Stories Garage ------.2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature CONDO/ Remodeling the kitchen- new cabinets and countertops. Removing a section of a non-bearing wall in the kitchen to open up this of Work rea up to the dining room. HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor DREXLER ELECTRIC Fees: VaIUa\i°'ll ,- Issued By: NA. $25,000.00 Plan Approval $0.00 Permit Fee Paid $139.00 Park Dedication $0.00 Date 01/04/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1320910000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit appiicant to contact the easement holder(s) and 0 secu ny necessary provals ore starting such activity. Signatur Agent/OWner OSHKOSH Date ~ /-¥-CJb" WI 54902 - 0000 Telephone Number 920-235-6710,585-31 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.