HomeMy WebLinkAbout0117752-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 1351WBENTAVE
CITY OF OSHKOSH
No
117752
BUILDING PERMIT - APPLICATION AND RECORD
Owner JULIE A HARRIS
Create Date
01/04/2006
Designer
Contractor
STEVE WERNER BUILDERS LLC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement -----2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living -----2 Sq. Ft. Bedrooms -----2 Stories
Garage -----2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Ftood Plain -
# Dwetling Units -------.!1
Height Permit
Park Dedication
# Structures
-------.!1
Use/Nature r>FRllnstaliation of new siding. soffit and fascia. No electrical work will be done in association with this project.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Val~at~n.
Issued By: ~~
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Date 01/04/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1202500000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see n necessary p rovals before starting such activity.
.--- /
Agent/Owner
Oshkosh
Daty{þ r/t-}i
WI 54901 - 0000 Telephone Number
231-1825
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.