HomeMy WebLinkAbout0117756-Plumbing (water heater)
e CITY OF OSHKOSH No 117756
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 217 W 7TH AVE Owner TIFANI D BRATTON Create Date 01/04/2006
Contractor JOHN D RANSOM Category 411 - Residential-Water Heaters Plan
Bathtub 0 Shower 0 Water Softner 0 Wai!.S!. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 PlasterSink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature I'~=~- -"'IT"""
of Work
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
0
0
0
0
0
0
0
0
0
0
Parcelld #
0900270000
Water Service
Valuation
$385.00
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Issued By
Date 01/04/2006
In the performance of this work, I agree to perform aJl work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address W5056 PARADISE LN
AgenUOwner
FOND DU LAC
WI 54935 - 0000
Telephone Number
920-922-1987
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.