Loading...
HomeMy WebLinkAbout0117730-Building e OSHKOSH ON THE WATER Job Address 1400-1406 W SOUTH PARK AVE CITY OF OSHKOSH No 117730 BUILDING PERMIT - APPLICATION AND RECORD Owner ONEILL ENTERPRISES INC Create Date 09/14/2005 Designer Contractor OWNER Category 130 - New Multi-Family Plan 03-72-0905 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: VBibc Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. Bedrooms 0 Stories 1 Baths 0 0 Projection I Finished/Living Canopies 0 Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain Height Permit Park Dedication Not Required # Dwelling Units 4 # Structures Use/Nature New 4 unit condo. Work above the Foundation. Each condo is 1535 sf with 2 car attached garage. Additional 3 stall garage built between of Work least 2 units and west 2 units. Plumbing Contractor HVAC Contractor Electric Contractor $1.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: V,c .' Date 12/30/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit ication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu an necessary ap vals befo starting s activity. Signature Date /-Z/¡¿O/ð , ' Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.