HomeMy WebLinkAbout0117730-Building
e
OSHKOSH
ON THE WATER
Job Address 1400-1406 W SOUTH PARK AVE
CITY OF OSHKOSH
No
117730
BUILDING PERMIT - APPLICATION AND RECORD
Owner ONEILL ENTERPRISES INC
Create Date
09/14/2005
Designer
Contractor
OWNER
Category
130 - New Multi-Family
Plan 03-72-0905
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const: VBibc
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories 1
Baths 0
0 Projection I
Finished/Living
Canopies 0
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain
Height Permit
Park Dedication
Not Required
# Dwelling Units 4
# Structures
Use/Nature New 4 unit condo. Work above the Foundation. Each condo is 1535 sf with 2 car attached garage. Additional 3 stall garage built between
of Work least 2 units and west 2 units.
Plumbing Contractor
HVAC Contractor
Electric Contractor
$1.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Fees: Valuation
Issued By: V,c .'
Date 12/30/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld #
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit ication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu an necessary ap vals befo starting s activity.
Signature
Date
/-Z/¡¿O/ð
, '
Address
Oshkosh
WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.