Loading...
HomeMy WebLinkAbout0117731-Building (landing & steps) e OSHKOSH ON THE WATER Job Address 18130REGONST CITY OF OSHKOSH No 117731 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT J HEARN Create Date 12/30/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~sq.Ft. ~sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ~sq.Ft. Baths 0 Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post . Pier 0 Treated Wood 0 Other 8" minimum Occupancy Penmit Not Required Flood Plain Height Penmit Park Dedication # Dwelling Units -----.2 # Structures -----.2 ~:~~~~ure I ~:~:~~~~;~~~~structing a 5'X3' landing with frost protection and steps off the front of the house. Code compliant handrails and HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: j.,RJ;.-.. $1,000.00 Plan Approval $0.00 Penmit Fee Paid $20.00 Park Dedication $0.00 Date 12/30/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1404780000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ny necessary app vals before starting such activity. Address 1813 OREGON ST OSHKOSH WI 54902 - 6964 Date ~Oþ.- 5'/- d$ Telephone Number Signature To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.