Loading...
HomeMy WebLinkAbout0117698 P e OSHKOSH ON THE WATER Job Address 1744 MARICOPA DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 117698 Owner JOHN RlAMY L ZIMMERMAN Category 411 - Residential-Water Heaters Contractor GARTMAN MECHANICAL Create Date 12/2812005 Plan Bathtub 0 Shower 0 Water Softner 0 Wait St. 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Site Drain 0 Breakrrn Sink 0 Dip Well 0 F Prep Sink 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Misc. 0 Fixtures Use/Nature r~~- .~.,= of Work Shamp Sink ~ FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec ~ Ice Maker 0 Gar Drain 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap ~ Ext Grease Trap ~ RPZValve 0 Eye Wash Statn ~ Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Size Type Conn. Type Material Sanitary Sewer Storm Sewer Water Service Valuation $700.00 $0.00 Permit Fees Plan Approval Date 12/28/2005 Issued By # 0 0 0 0 0 0 0 0 0 0 $20.00 D Permit Voided I Parcelld # 1316230000 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictons of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 520 W SOUTH PARK AV AgenVOwner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-5530 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.