HomeMy WebLinkAbout0117698 P
e
OSHKOSH
ON THE WATER
Job Address 1744 MARICOPA DR
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
117698
Owner JOHN RlAMY L ZIMMERMAN
Category 411 - Residential-Water Heaters
Contractor GARTMAN MECHANICAL
Create Date 12/2812005
Plan
Bathtub 0 Shower 0 Water Softner 0 Wait St. 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrrn Sink 0 Dip Well 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0
Misc. 0
Fixtures
Use/Nature r~~- .~.,=
of Work
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec ~
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker 0
Int Grease Trap ~
Ext Grease Trap ~
RPZValve 0
Eye Wash Statn ~
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Size
Type
Conn. Type
Material
Sanitary Sewer
Storm Sewer
Water Service
Valuation
$700.00
$0.00
Permit Fees
Plan Approval
Date 12/28/2005
Issued By
#
0
0
0
0
0
0
0
0
0
0
$20.00 D Permit Voided I
Parcelld #
1316230000
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictons of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 520 W SOUTH PARK AV
AgenVOwner
OSHKOSH
WI 54902 - 0000
Telephone Number 920-231-5530
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.