Loading...
HomeMy WebLinkAbout0117701-Plumbing (laterals) G OSHKOSH ON THE WATER Job Address 3275 CASEY TRL Contractor ADVANCE CONSTRUCTION INC CITY OF OSHKOSH No 117701 PLUMBING PERMIT - APPLICATION AND RECORD Owner CHET WESENBERG Create Date 12/28/2005 Category 401 - Residential-Exterior (laterals) Plan Bathtub 0 Shower 0 Water Softner 0 Wait. St. 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Púmp 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature EW SANITARY. STORM AND WATER LATERALS FOR NSF "PAID CASH of Work Coffee Maker 0 Int Grease Trap ----.9. Ext Grease Trap ----.9. RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Sanitary Sewer Size 4" Material Plastic Type Lateral # Conn. Type New Storm Sewer 4" Plastic Lateral New Water Service 11/2" Plastic Lateral New Parcelld # Not Assign $2,000.00 Plan Approval $0.00 Permit Fees $150.00 0 Permit Voided I Valuation Issued By Date 12/28/2005 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2082 LONDON RD Agent/Owner GREEN BAY WI 54311 - 0000 Telephone Number 920-468-9386 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.