HomeMy WebLinkAbout0117678 B
e
OSHKOSH
ON THE WATER
Job Address 1250 S WESTHAVEN DR
CITY OF OSHKOSH
No
117678
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS UMARY COOK
Create Date
12/27/2005
Designer
Contractor
P & N CONSTRUCTION LLC
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height Oft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
D Projection I
Canopies 0
Finished/Living
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
0
Use/Nature FRI Remodel kitchen - remove closet and all but one of the soffits. install new kitchen cabinets, and countertops. NO STRUCTURAL
of Work NORK
HVAC Contractor
Plumbing Contractor
SBS PLUMBING LLC
Electric Contractor
TRICAL CONTRACTING SPECIALISTS
$15,000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
$0.00
Issued By:
Date 12/27/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1312280000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easemen the City strongly urges the permit applicant to contact the easement
holder(s) and to s necessary approv ore starting such activity.
Date
Signature
Agent/Owner
Address PO BOX 2244
WI 54903 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.