Loading...
HomeMy WebLinkAbout0117678 B e OSHKOSH ON THE WATER Job Address 1250 S WESTHAVEN DR CITY OF OSHKOSH No 117678 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS UMARY COOK Create Date 12/27/2005 Designer Contractor P & N CONSTRUCTION LLC Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height Oft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I Canopies 0 Finished/Living Garage ~Sq.Ft. Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units 0 # Structures 0 Use/Nature FRI Remodel kitchen - remove closet and all but one of the soffits. install new kitchen cabinets, and countertops. NO STRUCTURAL of Work NORK HVAC Contractor Plumbing Contractor SBS PLUMBING LLC Electric Contractor TRICAL CONTRACTING SPECIALISTS $15,000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Issued By: Date 12/27/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1312280000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easemen the City strongly urges the permit applicant to contact the easement holder(s) and to s necessary approv ore starting such activity. Date Signature Agent/Owner Address PO BOX 2244 WI 54903 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.