HomeMy WebLinkAbout0117677-Building (west repair)
e
OSHKOSH
ON THE WATER
Job Address 556 W 9TH AVE
CITY OF OSHKOSH
No
117677
BUILDING PERMIT. APPLICATION AND RECORD
Owner JAMES A NIGL ETAL
Create Date
12/27/2005
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
205 - Alteration Amusement, Social, Recreation
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~sq.Ft.
Rooms
Height
0 Ft.
0 Projection I
FinishedlLiving
Bedrooms
Stories
Canopies
0
Garage
~ Sq. Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ----"
# Structures
----"
Use/Nature
of Work
avernl Repair west wall - vehicle damage. Repair framing, interior finish and exterior finish.
HVAC Contractor
Plumbing Contractor
Electric Contractor
BEEZ ELECTRIC INC
Fees: Valu I
$3,000.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 12/27/2005
FinaI/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0600980000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1224 W SOUTH PARK AVE
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.