Loading...
HomeMy WebLinkAbout0117677-Building (west repair) e OSHKOSH ON THE WATER Job Address 556 W 9TH AVE CITY OF OSHKOSH No 117677 BUILDING PERMIT. APPLICATION AND RECORD Owner JAMES A NIGL ETAL Create Date 12/27/2005 Designer Contractor DAN V BINDER CONSTRUCTION Category 205 - Alteration Amusement, Social, Recreation Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~sq.Ft. Rooms Height 0 Ft. 0 Projection I FinishedlLiving Bedrooms Stories Canopies 0 Garage ~ Sq. Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ----" # Structures ----" Use/Nature of Work avernl Repair west wall - vehicle damage. Repair framing, interior finish and exterior finish. HVAC Contractor Plumbing Contractor Electric Contractor BEEZ ELECTRIC INC Fees: Valu I $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 12/27/2005 FinaI/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0600980000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1224 W SOUTH PARK AVE AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number 231-2114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.