Loading...
HomeMy WebLinkAbout0117674-Plumbing e OSHKOSH ON THE WATER Job Address 3275 CASEY TRL Contractor SBS PLUMBING LLC CITY OF OSHKOSH No 117674 Create Date 12/22/2005 Plan 0 Shamp Sink 0 Coffee Maker 0 0 FlrlWst Sink 0 Int Grease Trap 0 0 Catch Basin 0 Ext Grease Trap 0 0 Wash Ftn 0 RPZValve 0 0 Urinal 0 Eye Wash Statn 0 0 Standp Rec 0 Wtr Sewer Mtrs 0 0 Ice Maker 0 Deduct Meters 0 0 Gar Drain 0 Wtr Usage Mtrs 0 0 Soda Disp 0 PLUMBING PERMIT - APPLICATION AND RECORD OWner CHET WESENBERG Category 410 - Residential-Interior Bathtub 1 Shower 3 Water Softner 0 Wait. St. Whirlpool 1 Floor Drain 0 Local Waste 0 Ice Chest Lavatory 6 Lndry Tray 0 Clothes Wshr 2 Exam Sink Toilet 5 Disposal 1 Bidet 0 Sculry Sink Res. Sink 1 Dishwasher 1 BeerTap 0 Hand Sink Bar Sink 0 Sump Pump 1 Lab Sink 0 Plaster Sink Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink Misc. 2 Fixtures Use/Nature r". '""" ,"mow -~. of Work Size Material Sanitary Sewer Storm Sewer Water Service Valuation $11,450.00 $0.00 Permit Fees Plan Approval Date 12/22/2005 Issued By Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type 0 0 0 0 0 $168.00 0 PennitVoided I Parcelld # Not Assign In the perfonnance of this work, I agree to perfonn all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 3904 Agent/Owner OSHKOSH Wi 54903 - 3904 Telephone Number 920-410-5933 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.