Loading...
HomeMy WebLinkAbout0117666-Building Ie C'SHKOSH ON THE WATER Job Address 222 W 8TH AVE CITY OF OSHKOSH No 117666 BUILDING PERMIT. APPLICATION AND RECORD OWner JEFFREY J MEETZ Create Date 10/25/2005 Designer Contractor OWNER Category 140 - Interior Remodeiíng Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----..!! Sq. Ft. Rooms Height 0 Ft. Finished/Living ----..!! Sq. Ft. Bedrooms 0 Stories Garage ----..!! Sq. Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain Height Permit # Dwelling Units ----.!1 # Structures 0 Park Dedication Use/Nature SFRI Remodeiing the interior of the house per the plans submitted. All construction shall comply with minimum iocai and state building of Work code requirements. This permit does not include any mechanical permits. NOTE: The permit is conditionally approved see the plan review letter on file for conditions. This permit does not include finishing the second fioor. Revised plans will need to be submitted and ~pproved for that addmonal work. HVAC Contractor UNKNOWN??? Plumbing Contractor UNKNOWN Electric Contractor BEEZ ELECTRiC INC Fees: valua:rn~ Issued By: Þ---. $21,320.00 Plan Approval $40.00 Permit Fee Paid $130.00 Park Dedication $0.00 Date 12/21/2005 Final/O.P. DO/DO/DODO 0 Permit Voided I Parcelld # 0900390000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiícation within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necess ppr als befor starting such activity. ~) 'ì I Signature Date ( l~,¿¡-, Address 18875 STILLPOINT TRL BROOKFIELD WI 53045 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. _._.._._----_.._--------_.~-_._-.---_._._-.J--_.._---~-.-.---------.....--.-...--- .. ~ OfHKOJH ON 'HE W^'" City of Oshkosh Division of inspection Services 215 Church Avenue PO Box 1130 OShkosh WI 54903-1130 Office 920-236-5050 Fax 920-236-5084 PLAN REVIEW Project Address: 222 W 8th St Submitted By: Andrew Meetz Plan Number: Reviewed By: NICOLE KRAHN Date Reviewed: 12/15/05 Phone Number: 414-364-9571 D Mailed ¡g¡ Faxed D Delivered Date: 5/19/03 Phone: 236-5036 Result of Plan Review: ¡g¡ Conditionally Approved D Withheld Pending Approval of Additional Information D Not-Approved, Plans Returned for Revisions Conditions Noted on Plan Review I) The loft area requires access per section 21.03(4) of the Uniform Dwelling Code. This section states "at least one stairway exit shall be provided, to the floor below, for a loft exceeding 400 square feet in area. At least one stairway or ladder exit shall be provided to the floor below for a loft, 400 square feet or less, in area." Please note that there is no allowance for a loft that is labeled "unoccupied" to be allowed without the required access. 2) The insulation is required to be installed so that the vapor retarder is on the warm side of the dwelling and so that the insulation is against the vapor retarder. This may be a concern if the loft area is not finished. In addition please note that light and ventilation requirements will apply to the loft area if it is finished. 3) The permit is Conditionally Approved provided the following inspection schedule is met without delays. * February 1, 2006 Remove all drywall and complete rough framing, electrical, heating, and plumbing work. Complete the exterior work (siding, installation of windows, construction of exits, etc.) Request and obtain inspection approvals for these stages of construction no later than Feb I, 2006. ,° . *March 1,2006 Complete the insulation. Request and obtain inspection approval. *May 15, 2006 Construction is complete. Request and obtain final inspection approvals for plumbing, heating, electrical, and building. Please note that failure to comply with these deadlines will result in the razing of this building. S~(ÿofAþþltcant: ~iw~- VatlÞ: lL~ 2 /- G}) ---