HomeMy WebLinkAbout0117651-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 838 MCKINLEY ST
CITY OF OSHKOSH
No
117651
BUILDING PERMIT -APPLICATION AND RECORD
Owner 838 MCKINLEY STREET LLC
Create Date
12/20/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths
0 Pier . Other
0 Treated Wood
Size
Zoning
Unfinished/Basement
------.2 Sq. Ft.
------.2 Sq. Ft.
0 Projection I
Canopies
Finished/Living
Garage
------.2 Sq. Ft.
Signs
0
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units -----2
# Structures
-----2
Use/Nature RES/ Replace 17 single hung windows and 1 picture window. Vinyl Replacement units.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
00.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 12/20/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0504920000
In the performance of this work i agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 601 OREGON ST
Agent/Owner
OSHKOSH
WI 54902 - 5965
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.